AZ EN RU

PROJECTS

Reconstruction and Expansion of Water supply and Sewerage Systems for Baku city

Since January 2012 "Azersu" OJSC started preparation of master plan of drinkingwater supply, sewerage and rain and flood water system of Absheron Peninsula for complex reconstruction of water supply and sewerage systems for Baku city and Absheron Peninsula. In this regard construction of wastewater treatment plant with capacity of 50 000m3/day under the project has not been considered efficiently. It was considered advisable to transmit of project area waste water to the wastewater treatment plant with capacity of 300 000m3/day to be constructed by "Azersu" OJSC in Lokbatan. As a result it was agreed in the meeting held between "Azersu" OJSC and Saudi Fund for Development on 5-8 July 2012 to direct funds to the reconstruction and expansion of water supply and sewerage system for project area instead of construction of wastewater treatment plant with capacity of 50 000 m3/day.

In accordance with the new "General Plan of Baku", it is expedient to make all the funds directed to the reconstruction and expansion of water supply and sewerage system of Badamdar settlement except Bayil, Bibiheybat and 20th residential area, making changes in the composition of the project. In this regard, the change in the project area was agreed upon with the Saudi Development Fund.

Works to be carried out under  the project:

-     Installation of water network lines

-     Installation of sewer net lines;

-     DN1020 Magistral Pipeline Installation;

-     Reconstruction of pump station +152;

-     Reconstruction of  +220 “Badamdar”  water reservoir